Swing shift at Camp No. 2600
Item
- Title
- Swing shift at Camp No. 2600
- Description
- Photo depicts the swing shift at Camp No. 2600 prior to lowering the first liner down upper raise penstock No. 2.
- Identifier
- P00059.jpg
- Date
- 22-Nov-55
- Source
- Alcan ID no. 5793.Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
- Item sets
- Alcan Project History
- Site pages
- The Tunnel